Village of Arkport Water System ImprovementsMRB Group provided design and construction management services
for this multi-phased water system improvement project in the
Village of Arkport, which consisted of the following elements:
Phase I included a new...read more
|
|
Reservoir Road Watermain ImprovementsMRB Group designed and installed 23,000 LF of 8” and 12”
watermain and appurtenances for the Town of Geneseo. In addition,
a 200,000 gallon elevated, welded steel water storage tank was
installed.
This project...read more
|
|
Village of Avon New Water Filtration PlantAs engineering consultant for the Village of Avon, MRB Group
was authorized to evaluate, design, inspect, and be construction
managers of a new 1.0 MGD water fi ltration plant project. The
project consisted of installing...read more
|
|
Canandaigua Water Booster Pump StationThe Town of Canandaigua contracted MRB Group to design a water booster pumping station on West Street in the Town. The booster pumps convey treated water from the City of Canandaigua to the Town of Canandaigua water...read more
|
|
Dansville Water Treatment PlantMRB Group completed construction on this new water treatment facility for the Village of Dansville. The facility contains three US Filter stainless steel structures each capable of filtering 1.0 million gallons of...read more
|
|
Hume Water System ImprovementsMRB Group provided design services to the Town of Hume for its Water System Improvements project. The two-phase project included replacing several old, outdated watermains, improving fire flows to the existing district,...read more
|
|
Ontario Raw Water Intake Treatment PlantMRB Group was hired by the Town of Ontario to provide the following services for a new raw water intake system and pump station for the Town of Ontario’s 3.5 MG Water Treatment Plant:
• Study
•...read more
|
|
Seneca Falls Low Lift Pump StationMRB Group was hired to design a replacement low lift pump station for the Village of Seneca Falls and to upgrade its existing water treatment plant.
We designed numerous upgrades for the water treatment plant...read more
|
|
Village of VanEtten Water SystemMRB Group was hired to provide design and construction administration/ observation services for a new municipal water system that now serves the Village of VanEtten’s approximately 200 residential and commercial...read more
|
|
Avon Water Treatment PlantMRB Group is an Engineering Consultant for the Village of Avon. In this role, we evaluated, designed, inspected, and construction managed a new 1.0 MGD water filtration plant project for the Village of Avon.
The...read more
|