80 Years of Service

All Projects » Municipal » Parks/Recreation


Municipal Parks/Recreation

Spencerport Canal Side ImprovementsFollowing the development of a Comprehensive Plan to revitalize the Erie Canal shoreline in the Village of Spencerport, MRB Group provided design, permitting, and construction stakeout, coordination, and inspection...read more
Park Pedestrian BridgeMRB Group designed a replacement pedestrian bridge that connects two portions of the Hilton Village Park. The existing concrete bridge was located in a 100-year fl ood plain, which made it prone to flooding. Therefore,...read more
Churchville Park Pedestrian Bridge and PathwayThis project involved the design of a 30’ x 8’ simple span for use as a pedestrian path and crossing. Drainage improvements at an existing intersection were also done. Project Services included: - Design Services -...read more
Waterfront Development...read more
Erie Canal Access CenterMRB Group provided site design and engineering services for this Erie Canal marina in the Town of Macedon. The marina includes 45 dock slips, a concrete boat launch, a 30-ton gantry boat lift, retaining walls, docks,...read more
Canal Side ImprovementsFollowing the development of a Comprehensive Plan to revitalize the Erie Canal shoreline in the Village of Spencerport, MRB Group provided design, permitting, and construction stakeout, coordination, and inspection...read more
Canal Walkway/Stair Improvements and Parking Lot SignageMRB Group developed plans and documents for the Town of Pittsford to make improvements to the existing Canal walkway and incorporate signage in the newly developed parking lot. The parking lot is a municipal parking...read more
Hilton PavilionAs part of a program to upgrade the Hilton Village Park, the Village constructed an enclosed pavilion. The pavilion contains restroom facilities, a kitchen, and seating area. Also, it included adjacent site improvements...read more

Back to Home Page
info@mrbgroup.com
© MRB | group. All rights reserved worldwide.
sitemap