80 Years of Service

All Projects » Municipal


Municipal Architecture

Village Office Building Construction ServicesMRB Group worked with ALA Architects to help the Village of Churchville redevelop their central business district. We provided construction management services for the new Village Office Building, walking paths, and...read more
Canadice Town HallMRB Group designed a 4,160 square foot new Town Hall for the Town of Canadice. The facilities include office space for the Town Supervisor, Town Clerk, Assessor, and Building Department. We also included a...read more
Salt Storage FacilityMRB Group helped the Town of Canandaigua with planning and site layout for their new salt storage facility. We coordinated the project with Advanced Storage Technologies, Inc. who patented the design. The salt storage...read more
Town of Gates Justice Court AdditionMRB Group designed a one story, 12,500 square foot addition to the Town of Gates Justice Court Facility. Our objective was to carefully blend the addition with the existing building. The Town of Gates Justice Court...read more
Avon Fire HallMRB Group designed plans for The Town of Avon’s new fire hall in 2003. We then provided construction observation services while it was being built in 2003 and 2004. The new structure is a 15,000 square foot pre-fabricated,...read more
Fire Hall Renovation and AdditionThe Mumford Fire District hired MRB Group to perform a conceptual study to identify and compare options for improving their facilities. The options included building a new structure vs. rehabilitating the existing historic...read more
Community Center RehabilitationMRB Group designed the expansion and rehabilitation of a former grade school building into the Town of Penfield Community Center. Project elements included: Total court system with two large courtrooms and...read more
Riga Highway GarageMRB Group designed a highway garage for the Town of Riga. The structure features: 10,416 square foot building 3,147 square foot parts mezzanine 3,502 square feet of storage 3,457 square foot maintenance...read more
Existing Conditions Analysis and Site Master PlanMRB Group completed an Existing Conditions Analysis of the joint Pembroke Town Hall and Highway Department Facility. Our evaluation considered structural, HVAC, electrical, site drainage, and salt storage issues. The...read more
Public Library and Community Center Renovation and ExpansionIn 1985, the Town of Penfield hired MRB Group to convert a 1950’s school building into a community center and library. Fifteen years later, in 2000, the Town of Penfield contracted us again to design an expansion...read more
Lima Ambulance FacilityMRB Group designed and managed construction bidding of a new ambulance facility for the Village of Lima. This 5,700 square foot ambulance facility includes concrete plank walls with siding, a brick ledge along the lower...read more
Stafford Town HallMRB Group designed a 5,000 square foot one-story Town Hall for the Town of Stafford. The new facility includes: The Town Court Office space for the Town Supervisor, Town Clerk, Assessor, Building Department,...read more
Seneca Town HallMRB Group designed a 5,202 square foot, one-story brick building for the Town of Seneca’s new Town Hall. The new facility includes: Office space for the Town Supervisor, Town Clerk, Assessor and Assistant, Bookkeeper,...read more
Wheatland Joint Municipal FacilityMRB Group provided master planning and design services for a joint municipal facility in the Village of Scottsville. Phase I was to relocate the Fire Department to a newly constructed Fire Hall. Phase II...read more
Village Hall and Police StationMRB Group designed a plan for the Village of Seneca Falls to relocate the Village and Police Offices to an abandoned railroad depot previously used as a machine shop. (An active railroad line is located 20 feet from...read more
Riga Town Offices and CourthouseMRB Group designed a new single-story masonry facility to house the Town of Riga’s administrative functions and courtroom proceedings. We designed the building with an “L” shaped layout so we could locate the Town offices...read more
Mumford Fire Hall Renovation and AdditionThe Mumford Fire District hired MRB Group to perform a conceptual study to identify and compare options for improving their facilities. The options included building a new structure vs. rehabilitating the existing historic...read more

Municipal GIS/Mapping

GIS Sewer ProjectsMRB Group is committed to utilizing GIS, whenever possible, for sewer design jobs for our municipal clients. Even if a client doesn’t have an existing GIS system, we create our digital sewer files in AutoCAD with...read more
GIS Water System Conversion ProjectMRB Group was hired by the Town of Canandaigua to convert their aging water system maps — some as old as 50 years — to a digital format using Geographic Information System (GIS) technology. Since some of the paper...read more
Pavement Management System  MRB Group has assisted several communities with pavement management systems by utilizing the GIS enabled MicroPAVER 6.x software packaged developed by the Army Corps of Engineers. A typical study includes...read more
Utility MappingFor years, the Village of Dansville had relied on old maps, plans, and drawings for the documented location of their water and sewer utilities. As is typical with most communities, many of these utility location plans...read more
GIS Watermain ProjectsMRB Group is committed to utilizing GIS, whenever possible, for Watermain design jobs for our municipal clients. Even if a client doesn’t have an existing GIS system, we create our digital watermain fi les in AutoCAD...read more
GIS Tax Mapping and District Mapping ProjectsMRB Group has worked with many of our municipal clients in planning the implementation of their GIS systems. Many times the fi rst base GIS layer that is required is a digital version of the municipalitie’s tax mapping...read more
GIS Sanitary Sewer System MappingFor this project, MRB Group created a digital GIS Sewer geodatabase of the Village of Spencerport Sanitary Sewer System. Having worked with the Village on several prior occasions, MRB Group was able to maximize effi...read more
Canandaigua Water ProjectMRB Group was hired by the Town of Canandaigua to convert its aging water system maps --some as old as 50 years — to a digital format using Geographic Information System (GIS) technology. Some of the paper maps...read more
I/I SurveyThe Office of General Services asked us to complete an Inflow/Infiltration survey of the sanitary collection systems serving the Attica and Wyoming Correctional Facilities. These facilities consist of three complexes:...read more
Map Guide/ Internet ViewerMRB Group used the AutoDesk MapGuide open source software to create a powerful internet GIS application for the Village and Town of Avon. Since the open source software is free to use and develop, MRB Group was able...read more
GIS Needs AssessmentMRB Group specializes in working with its clients to identify and develop cost effective GIS solutions. Our long history working with municipalities has given us a unique insight into the typical GIS needs of our clients....read more
Arc ReaderMRB Group has leveraged the free ESRI ArcReader software as a way to distribute a high quality desktop GIS viewer for     municipalities.  As a result the read only structure and easy to use interface...read more
Ontario Utility Mapping  MRB Group used a combination of GPS technology, conventional surveying, and record map scanning to create seamless GIS utility mapping for the entire Town of Ontario. All features for the water, sanitary, and...read more

Municipal Highways / Road

Calkins Road Realignment - Town of PittsfordThis project consisted of improvements to two intersections — Stone Road and Calkins Road — on Tobey Road in the Town of Pittsford.  Project improvements included road widening, addition of turning lanes,...read more
Shoecraft Road - Town of WebsterThis project involved realigning Shoecraft Road’s existing intersection with NYS Route 404 to line up with the intersection of Hard Road.   The realignment project resulted from the New York State Route...read more
Lamb Road Improvements - Village of Seneca FallsThe Seneca County Industrial Development Agency (IDA) was issued a grant to reconstruct Lamb Road for heavy truck traffic to support the large industries on Lamb Road, better attract new businesses to the area, and for...read more
Hojack Lane - Village of HiltonThis project involved construction of a new village road within an existing railroad right-of-way to serve as a new connector road.  This improved the flow of traffic through the Village of Hilton to the Hilton...read more
Route 332 Street Lighting - Town of CanandaiguaThe Route 332 highway reconstruction project was nearly complete when MRB Group was contracted to do the street lighting portion of the project.  This presented a unique situation because it required us to perform...read more
Chestnut Street Reconstruction - Village of GeneseoThis project involved the reconstruction of Chestnut Street (approximately 600 LF), portions of Park Street (approximately 400 LF), and Main Street as part of a major storm drainage improvement project for the Village....read more
Intersection Reconstruction - Town of PenfieldThis project involved the re-alignment and redesign of the Atlantic Avenue/Whalen Road/Scribner Road intersection.  The project scope included road widening, addition of left turn lanes on each approach, a right...read more
Street Lighting Improvement - Village of BergenThe Village of Bergen hired MRB Group to help enhance their commerce/business district. The specific objective of the project was to beautify the Village streetscape while maintaining its “Victorian” look. We...read more
Canning, Hazen and Upton Street IntersectionIn an effort to stimulate commercial and industrial development in the Village Hilton, the junction of three dead end streets were connected to create an intersection/park like area.   For this project MRB completed...read more
North Avenue Pavement Improvement - Town of GreeceThis project involved re-routing Larkin Creek and installing roadside drainage structures, new underdrain, and storm sewers to eliminate the existing deep drainage swales on either side of the road and improve roadside...read more
Airport Road Extension - Town of CanandaiguaMRB Group assisted the Town of Canandaigua with an overall Comprehensive Plan that included the Airport Road extension and Brickyard Road drainage improvements. For this project, the Town of Canandaigua constructed:...read more

Municipal Parks/Recreation

Spencerport Canal Side ImprovementsFollowing the development of a Comprehensive Plan to revitalize the Erie Canal shoreline in the Village of Spencerport, MRB Group provided design, permitting, and construction stakeout, coordination, and inspection...read more
Park Pedestrian BridgeMRB Group designed a replacement pedestrian bridge that connects two portions of the Hilton Village Park. The existing concrete bridge was located in a 100-year fl ood plain, which made it prone to flooding. Therefore,...read more
Churchville Park Pedestrian Bridge and PathwayThis project involved the design of a 30’ x 8’ simple span for use as a pedestrian path and crossing. Drainage improvements at an existing intersection were also done. Project Services included: - Design Services -...read more
Waterfront Development...read more
Erie Canal Access CenterMRB Group provided site design and engineering services for this Erie Canal marina in the Town of Macedon. The marina includes 45 dock slips, a concrete boat launch, a 30-ton gantry boat lift, retaining walls, docks,...read more
Canal Side ImprovementsFollowing the development of a Comprehensive Plan to revitalize the Erie Canal shoreline in the Village of Spencerport, MRB Group provided design, permitting, and construction stakeout, coordination, and inspection...read more
Canal Walkway/Stair Improvements and Parking Lot SignageMRB Group developed plans and documents for the Town of Pittsford to make improvements to the existing Canal walkway and incorporate signage in the newly developed parking lot. The parking lot is a municipal parking...read more
Hilton PavilionAs part of a program to upgrade the Hilton Village Park, the Village constructed an enclosed pavilion. The pavilion contains restroom facilities, a kitchen, and seating area. Also, it included adjacent site improvements...read more

Municipal Planning

US Army Reserve Center ReuseAs part of the Base Reuse and Closure (BRAC) process, the Department of Defense designated the Town of Niagara to be the sole entity responsible for preparing a redevelopment plan for a soon to be closed US Army Reserve...read more
Town of Wheatland Comprehensive PlanA Comprehensive Plan presents a “vision” of future land use within a municipality. The document describes the vision in suffi cient detail to guide the day-to-day planning decisions that shape land use and development...read more
Town of Penfield Land Use Access Management PlanThe Town of Penfield hired MRB Group to prepare a Land Use Access Management Plan for the intersection of Routes 441 and 250. Working with the Town and the New York State Department of Transportation, long-term development...read more

Municipal Sewage Collection Systems

Pump Station ImprovementsMRB Group was hired to make improvements to this Town of Penfi eld pump station located at the southern end of Irondequoit Bay, which provides sanitary sewer service to properties along Empire Boulevard. The project...read more
Bear Creek Pump StationMRB Group designed the original wastewater plant for the Town of Ontario in 1977. Since that time, MRB Group has engineered numerous upgrades and improvements to these facilities. In 2000, a project was engineered...read more
Pump Station Improvements at the Wastewater Treatment PlantMRB Group was hired as the design engineers and construction managers for this Wastewater Treatment Plant Improvement Project, which involved civil, structural, electrical, HVAC, instrumentation, and survey disciplines....read more
Spencerport Pump StationThe Village, with assistance from MRB Group, has evaluated several options in the past few years to upgrade and expand their existing WWTF. Based on these evaluations, the Village Board chose to construct a pump station...read more
Spencerport ForcemainThe Village of Spencerport Forcemain project is part of a large capital project to construct a pump station and forcemain to convey Spencerport’s sewage to a Monroe County Pure Waters interceptor sewer. Because this...read more
Pump Station ImprovementsMRB Group was hired to make improvements to four Town of Ontario pump stations, while maintaining full operation throughout the construction process. The project involved retrofi tting the existing submersible type sewage...read more
Pump Station No. 3The Farmington wastewater treatment facility, located on McMahon Rd, currently services the Towns of Farmington and Victor, including Eastview Mall. Having worked with the Town of Farmington since the design of the...read more
Creek Street Sanitary SewerWork is now completed on the heart of the Town’s Extension 16 Sanitary Sewer Project. This project provided sanitary sewer service to over 300 homes and businesses in the Creek Street- Browncroft vicinity. The...read more
Spencerport ForcemainThe Village of Spencerport hired MRB Group to work on its forcemain project, which is part of a large capital project to construct a pump station and forcemain to convey Spencerport’s sewage to a Monroe County...read more

Municipal Storm Water Management

Monroe County Dewey Avenue CulvertThis project used a three-sided pre-cast segmental rectangular arch to replace a deteriorated 15’ x 7’ concrete culvert carrying Slater creek on a skewed alignment under Dewey Avenue - consisting of four traffi c...read more
Town of Perinton Erosion AbatementMRB Group, working with the Town of Perinton, successfully completed the stabilization of a 75 foot high embankment, which was at a 1:1 slope. The erosion associated with the slope was not only degrading the water...read more
Seneca Falls Comprehensive Drainage StudyIn 1999, MRB Group was hired to complete a comprehensive drainage study of the entire Village of Seneca Falls. The study included existing drainage conditions and infrastructure, existing and potential problem areas,...read more
Baird Road Culvert Replacement    The Town of Penfield wanted to replace an obsolete stone box culvert carrying Baird Road over Hipp Brook. They wanted the new culvert to: • Maintain the same waterway opening as the original structure •...read more
Larking Creek Channel    MRB Group was hired by the Town of Greece to develop plans and specifications for channel improvements at three locations along Round Pond Creek and Larkin Creek.   The project was financed through...read more
Mill Creek Erosion Control - Pittsford    The Town of Pittsford contracted MRB Group to work on an erosion/bank stabilization project to mitigate erosion impacts on the embankments of Mill Creek near LePere Drive in the Town.   MRB Group...read more
Sand Hill Road Bridge    MRB Group was hired by the Town of Farmington to develop a road and bridge design to replace an existing bridge that was in poor condition, and to provide grading and stabilization of the banks along...read more
St John Fisher CollegeMRB Group was contracted by St. John Fisher College to analyze the existing drainage collection system and drainage patterns for 23 acres around the campus athletic facility. The College is an independent, liberal...read more

Municipal Wastewater Treatment Facility

Red Creek Regional Wastewater Treatment FacilityMRB Group designed and bid this new regional Wastewater Treatment Facility in 2005 after preparing the Engineering Report and Facility Plan, which formed the basis of design and brought closure to years of planning...read more
Penfield Sewer Operations BuildingMRB Group developed plans and specifications for a new metal building for the Town of Penfield’s sewer department at its highway garage campus on Jackson Road. We worked closely with the Town to prepare the construction...read more
Avon Wastewater Treatment FacilityMRB Group has designed improvements and administered construction for many projects at the Village sewage treatment plant over the past several years, including improvements to various components of the facility.   Here...read more
Farmington Wastewater Treatment FacilityThe Farmington wastewater treatment facility, located on McMahon Rd., services the Towns of Farmington and Victor, including Eastview Mall. MRB Group has worked with the Town of Farmington since we designed its initial...read more
Geneseo Wastewater Treatment FacilityMRB Group was hired to complete the contract documents for a wastewater treatment plant for the Village of Geneseo.   As part of the Village of Geneseo’s wastewater treatment plant project, we worked on...read more
Lyon's Wastewater Treatment FacilityIn 1994, MRB Group was hired by the Village of Lyons to: • Conduct a Facility Plan to evaluate the Village’s wastewater treatment plant condition • Review alternatives to improve the performance...read more
Ontario Wastewater Treatment FacilityThe Town of Ontario contracted MRB Group to provide services from our many disciplines on this project to replace and rehabilitate the Town’s original Wastewater Treatment Facility Plant components: •...read more
Seneca Falls Wastewater Treatment FacilityMRB Group was hired to be the design engineers and construction managers for a Wastewater Treatment Plant Improvement Project for the Village of Seneca Falls. The project scope involved six disciplines: • Civil •...read more
Wayland Wastewater Treatment FacilityMRB Group was contracted to prepare a Facility Plan to determine a cost-effective method for repairing, rehabilitating, and replacing the Village of Wayland’s existing waste water treatment plant facilities....read more
Waterloo Wastewater Treatment FacilityMRB Group was hired as the design engineers and construction managers for the Village of Waterloo wastewater treatment plant improvement project.   As part of our project scope, we had to ensure the construction...read more
Mt Morris Compositing FacilityMRB Group was hired by the Village of Mt. Morris to help construct a sewage sludge composting facility.   The end result is a facility where sewage sludge composting takes place under an enclosed pole barn structure...read more
Ontario Compositing FacilityMRB Group was hired to design and construct of a 240’ x 60’ composting facility for the Town of Ontario.   The design objective of the new compositing facility was to provide an economical means...read more
Bristol Water/Wastewater Treatment Plant  Bristol Mountain Ski Resort contracted MRB Group to work on a wastewater project consisting of a package plant to replace the existing RBC plant. The objective was for the new facility equipment to utilize...read more
Macedon Wastewater Treatment FacilityThis project involved the upgrading of the Town/Village of Macedon’s Wastewater Treatment Facility using two synthetic media bio-towers. Each tower is 18’0" high and 40’-0" in diameter....read more
Mt Morris Compositing Facility UpgradeThis project involved the construction of a 50’ x 80’ addition to the existing pole barn structure, as well as the purchase of a new screening machine. MRB Group worked with the Village on this project...read more

Municipal Water Supply, Treatment, Distribution

Village of Arkport Water System ImprovementsMRB Group provided design and construction management services for this multi-phased water system improvement project in the Village of Arkport, which consisted of the following elements: Phase I included a new...read more
Reservoir Road Watermain ImprovementsMRB Group designed and installed 23,000 LF of 8” and 12” watermain and appurtenances for the Town of Geneseo. In addition, a 200,000 gallon elevated, welded steel water storage tank was installed. This project...read more
Village of Avon New Water Filtration PlantAs engineering consultant for the Village of Avon, MRB Group was authorized to evaluate, design, inspect, and be construction managers of a new 1.0 MGD water fi ltration plant project. The project consisted of installing...read more
Canandaigua Water Booster Pump StationThe Town of Canandaigua contracted MRB Group to design a water booster pumping station on West Street in the Town. The booster pumps convey treated water from the City of Canandaigua to the Town of Canandaigua water...read more
Dansville Water Treatment PlantMRB Group completed construction on this new water treatment facility for the Village of Dansville. The facility contains three US Filter stainless steel structures each capable of filtering 1.0 million gallons of...read more
Hume Water System ImprovementsMRB Group provided design services to the Town of Hume for its Water System Improvements project. The two-phase project included replacing several old, outdated watermains, improving fire flows to the existing district,...read more
Ontario Raw Water Intake Treatment PlantMRB Group was hired by the Town of Ontario to provide the following services for a new raw water intake system and pump station for the Town of Ontario’s 3.5 MG Water Treatment Plant: • Study •...read more
Seneca Falls Low Lift Pump StationMRB Group was hired to design a replacement low lift pump station for the Village of Seneca Falls and to upgrade its existing water treatment plant.   We designed numerous upgrades for the water treatment plant...read more
Village of VanEtten Water SystemMRB Group was hired to provide design and construction administration/ observation services for a new municipal water system that now serves the Village of VanEtten’s approximately 200 residential and commercial...read more
Avon Water Treatment PlantMRB Group is an Engineering Consultant for the Village of Avon. In this role, we evaluated, designed, inspected, and construction managed a new 1.0 MGD water filtration plant project for the Village of Avon.   The...read more

Back to Home Page
info@mrbgroup.com
© MRB | group. All rights reserved worldwide.
sitemap