| Village Office Building Construction ServicesMRB Group worked with ALA Architects to help the Village of Churchville redevelop their central business district. We provided construction management services for the new Village Office Building, walking paths, and...read more |
| Canadice Town HallMRB Group designed a 4,160 square foot new Town Hall for the Town of Canadice. The facilities include office space for the Town Supervisor, Town Clerk, Assessor, and Building Department. We also included a...read more |
| Salt Storage FacilityMRB Group helped the Town of Canandaigua with planning and site layout for their new salt storage facility. We coordinated the project with Advanced Storage Technologies, Inc. who patented the design. The salt storage...read more |
| Town of Gates Justice Court AdditionMRB Group designed a one story, 12,500 square foot addition to the Town of Gates Justice Court Facility. Our objective was to carefully blend the addition with the existing building. The Town of Gates Justice Court...read more |
| Avon Fire HallMRB Group designed plans for The Town of Avon’s new fire hall in 2003. We then provided construction observation services while it was being built in 2003 and 2004. The new structure is a 15,000 square foot pre-fabricated,...read more |
| Fire Hall Renovation and AdditionThe Mumford Fire District hired MRB Group to perform a conceptual study to identify and compare options for improving their facilities. The options included building a new structure vs. rehabilitating the existing historic...read more |
| Community Center RehabilitationMRB Group designed the expansion and rehabilitation of a former grade school building into the Town of Penfield Community Center. Project elements included: Total court system with two large courtrooms and...read more |
| Riga Highway GarageMRB Group designed a highway garage for the Town of Riga. The structure features: 10,416 square foot building 3,147 square foot parts mezzanine 3,502 square feet of storage 3,457 square foot maintenance...read more |
| Existing Conditions Analysis and Site Master PlanMRB Group completed an Existing Conditions Analysis of the joint Pembroke Town Hall and Highway Department Facility. Our evaluation considered structural, HVAC, electrical, site drainage, and salt storage issues. The...read more |
| Public Library and Community Center Renovation and ExpansionIn 1985, the Town of Penfield hired MRB Group to convert a 1950’s school building into a community center and library. Fifteen years later, in 2000, the Town of Penfield contracted us again to design an expansion...read more |
| Lima Ambulance FacilityMRB Group designed and managed construction bidding of a new ambulance facility for the Village of Lima. This 5,700 square foot ambulance facility includes concrete plank walls with siding, a brick ledge along the lower...read more |
| Stafford Town HallMRB Group designed a 5,000 square foot one-story Town Hall for the Town of Stafford. The new facility includes: The Town Court Office space for the Town Supervisor, Town Clerk, Assessor, Building Department,...read more |
| Seneca Town HallMRB Group designed a 5,202 square foot, one-story brick building for the Town of Seneca’s new Town Hall. The new facility includes: Office space for the Town Supervisor, Town Clerk, Assessor and Assistant, Bookkeeper,...read more |
| Wheatland Joint Municipal FacilityMRB Group provided master planning and design services for a joint municipal facility in the Village of Scottsville. Phase I was to relocate the Fire Department to a newly constructed Fire Hall. Phase II...read more |
| Village Hall and Police StationMRB Group designed a plan for the Village of Seneca Falls to relocate the Village and Police Offices to an abandoned railroad depot previously used as a machine shop. (An active railroad line is located 20 feet from...read more |
| Riga Town Offices and CourthouseMRB Group designed a new single-story masonry facility to house the Town of Riga’s administrative functions and courtroom proceedings. We designed the building with an “L” shaped layout so we could locate the Town offices...read more |
| Mumford Fire Hall Renovation and AdditionThe Mumford Fire District hired MRB Group to perform a conceptual study to identify and compare options for improving their facilities. The options included building a new structure vs. rehabilitating the existing historic...read more |
| GIS Sewer ProjectsMRB Group is committed to utilizing GIS, whenever possible, for sewer design jobs for our municipal clients. Even if a client doesn’t have an existing GIS system, we create our digital sewer files in AutoCAD with...read more |
| GIS Water System Conversion ProjectMRB Group was hired by the Town of Canandaigua to convert their aging water system maps — some as old as 50 years — to a digital format using Geographic Information System (GIS) technology. Since some of the paper...read more |
| Pavement Management System MRB Group has assisted several communities with pavement management systems by utilizing the GIS enabled MicroPAVER 6.x software packaged developed by the Army Corps of Engineers. A typical study includes...read more |
| Utility MappingFor years, the Village of Dansville had relied on old maps, plans, and drawings for the documented location of their water and sewer utilities. As is typical with most communities, many of these utility location plans...read more |
| GIS Watermain ProjectsMRB Group is committed to utilizing GIS, whenever possible, for Watermain design jobs for our municipal clients. Even if a client doesn’t have an existing GIS system, we create our digital watermain fi les in AutoCAD...read more |
| GIS Tax Mapping and District Mapping ProjectsMRB Group has worked with many of our municipal clients in planning the implementation of their GIS systems. Many times the fi rst base GIS layer that is required is a digital version of the municipalitie’s tax mapping...read more |
| GIS Sanitary Sewer System MappingFor this project, MRB Group created a digital GIS Sewer geodatabase of the Village of Spencerport Sanitary Sewer System. Having worked with the Village on several prior occasions, MRB Group was able to maximize effi...read more |
| Canandaigua Water ProjectMRB Group was hired by the Town of Canandaigua to convert its aging water system maps --some as old as 50 years — to a digital format using Geographic Information System (GIS) technology. Some of the paper maps...read more |
| I/I SurveyThe Office of General Services asked us to complete an Inflow/Infiltration survey of the sanitary collection systems serving the Attica and Wyoming Correctional Facilities. These facilities consist of three complexes:...read more |
| Map Guide/ Internet ViewerMRB Group used the AutoDesk MapGuide open source software to create a powerful internet GIS application for the Village and Town of Avon. Since the open source software is free to use and develop, MRB Group was able...read more |
| GIS Needs AssessmentMRB Group specializes in working with its clients to identify and develop cost effective GIS solutions. Our long history working with municipalities has given us a unique insight into the typical GIS needs of our clients....read more |
| Arc ReaderMRB Group has leveraged the free ESRI ArcReader software as a way to distribute a high quality desktop GIS viewer for municipalities. As a result the read only structure and easy to use interface...read more |
| Ontario Utility Mapping MRB Group used a combination of GPS technology, conventional surveying, and record map scanning to create seamless GIS utility mapping for the entire Town of Ontario. All features for the water, sanitary, and...read more |
| Calkins Road Realignment - Town of PittsfordThis project consisted of improvements to two intersections — Stone Road and Calkins Road — on Tobey Road in the Town of Pittsford. Project improvements included road widening, addition of turning lanes,...read more |
| Shoecraft Road - Town of WebsterThis project involved realigning Shoecraft Road’s existing intersection with NYS Route 404 to line up with the intersection of Hard Road. The realignment project resulted from the New York State Route...read more |
| Lamb Road Improvements - Village of Seneca FallsThe Seneca County Industrial Development Agency (IDA) was issued a grant to reconstruct Lamb Road for heavy truck traffic to support the large industries on Lamb Road, better attract new businesses to the area, and for...read more |
| Hojack Lane - Village of HiltonThis project involved construction of a new village road within an existing railroad right-of-way to serve as a new connector road. This improved the flow of traffic through the Village of Hilton to the Hilton...read more |
| Route 332 Street Lighting - Town of CanandaiguaThe Route 332 highway reconstruction project was nearly complete when MRB Group was contracted to do the street lighting portion of the project. This presented a unique situation because it required us to perform...read more |
| Chestnut Street Reconstruction - Village of GeneseoThis project involved the reconstruction of Chestnut Street (approximately 600 LF), portions of Park Street (approximately 400 LF), and Main Street as part of a major storm drainage improvement project for the Village....read more |
| Intersection Reconstruction - Town of PenfieldThis project involved the re-alignment and redesign of the Atlantic Avenue/Whalen Road/Scribner Road intersection. The project scope included road widening, addition of left turn lanes on each approach, a right...read more |
| Street Lighting Improvement - Village of BergenThe Village of Bergen hired MRB Group to help enhance their commerce/business district. The specific objective of the project was to beautify the Village streetscape while maintaining its “Victorian” look. We...read more |
| Canning, Hazen and Upton Street IntersectionIn an effort to stimulate commercial and industrial development in the Village Hilton, the junction of three dead end streets were connected to create an intersection/park like area. For this project MRB completed...read more |
| North Avenue Pavement Improvement - Town of GreeceThis project involved re-routing Larkin Creek and installing roadside drainage structures, new underdrain, and storm sewers to eliminate the existing deep drainage swales on either side of the road and improve roadside...read more |
| Airport Road Extension - Town of CanandaiguaMRB Group assisted the Town of Canandaigua with an overall Comprehensive Plan that included the Airport Road extension and Brickyard Road drainage improvements. For this project, the Town of Canandaigua constructed:...read more |
| Spencerport Canal Side ImprovementsFollowing the development of a Comprehensive Plan to revitalize the Erie Canal shoreline in the Village of Spencerport, MRB Group provided design, permitting, and construction stakeout, coordination, and inspection...read more |
| Park Pedestrian BridgeMRB Group designed a replacement pedestrian bridge that connects two portions of the Hilton Village Park. The existing concrete bridge was located in a 100-year fl ood plain, which made it prone to flooding. Therefore,...read more |
| Churchville Park Pedestrian Bridge and PathwayThis project involved the design of a 30’ x 8’ simple span for use as a pedestrian path and crossing. Drainage improvements at an existing intersection were also done. Project Services included: - Design Services -...read more |
| Waterfront Development...read more |
| Erie Canal Access CenterMRB Group provided site design and engineering services for this Erie Canal marina in the Town of Macedon. The marina includes 45 dock slips, a concrete boat launch, a 30-ton gantry boat lift, retaining walls, docks,...read more |
| Canal Side ImprovementsFollowing the development of a Comprehensive Plan to revitalize the Erie Canal shoreline in the Village of Spencerport, MRB Group provided design, permitting, and construction stakeout, coordination, and inspection...read more |
| Canal Walkway/Stair Improvements and Parking Lot SignageMRB Group developed plans and documents for the Town of Pittsford to make improvements to the existing Canal walkway and incorporate signage in the newly developed parking lot. The parking lot is a municipal parking...read more |
| Hilton PavilionAs part of a program to upgrade the Hilton Village Park, the Village constructed an enclosed pavilion. The pavilion contains restroom facilities, a kitchen, and seating area. Also, it included adjacent site improvements...read more |
| US Army Reserve Center ReuseAs part of the Base Reuse and Closure (BRAC) process, the Department of Defense designated the Town of Niagara to be the sole entity responsible for preparing a redevelopment plan for a soon to be closed US Army Reserve...read more |
| Town of Wheatland Comprehensive PlanA Comprehensive Plan presents a “vision” of future land use within a municipality. The document describes the vision in suffi cient detail to guide the day-to-day planning decisions that shape land use and development...read more |
| Town of Penfield Land Use Access Management PlanThe Town of Penfield hired MRB Group to prepare a Land Use Access Management Plan for the intersection of Routes 441 and 250. Working with the Town and the New York State Department of Transportation, long-term development...read more |
| Pump Station ImprovementsMRB Group was hired to make improvements to this Town of Penfi eld pump station located at the southern end of Irondequoit Bay, which provides sanitary sewer service to properties along Empire Boulevard. The project...read more |
| Bear Creek Pump StationMRB Group designed the original wastewater plant for the Town of Ontario in 1977. Since that time, MRB Group has engineered numerous upgrades and improvements to these facilities. In 2000, a project was engineered...read more |
| Pump Station Improvements at the Wastewater Treatment PlantMRB Group was hired as the design engineers and construction managers for this Wastewater Treatment Plant Improvement Project, which involved civil, structural, electrical, HVAC, instrumentation, and survey disciplines....read more |
| Spencerport Pump StationThe Village, with assistance from MRB Group, has evaluated several options in the past few years to upgrade and expand their existing WWTF. Based on these evaluations, the Village Board chose to construct a pump station...read more |
| Spencerport ForcemainThe Village of Spencerport Forcemain project is part of a large capital project to construct a pump station and forcemain to convey Spencerport’s sewage to a Monroe County Pure Waters interceptor sewer. Because this...read more |
| Pump Station ImprovementsMRB Group was hired to make improvements to four Town of Ontario pump stations, while maintaining full operation throughout the construction process. The project involved retrofi tting the existing submersible type sewage...read more |
| Pump Station No. 3The Farmington wastewater treatment facility, located on McMahon Rd, currently services the Towns of Farmington and Victor, including Eastview Mall. Having worked with the Town of Farmington since the design of the...read more |
| Creek Street Sanitary SewerWork is now completed on the heart of the Town’s Extension 16 Sanitary Sewer Project. This project provided sanitary sewer service to over 300 homes and businesses in the Creek Street- Browncroft vicinity. The...read more |
| Spencerport ForcemainThe Village of Spencerport hired MRB Group to work on its forcemain project, which is part of a large capital project to construct a pump station and forcemain to convey Spencerport’s sewage to a Monroe County...read more |
| Monroe County Dewey Avenue CulvertThis project used a three-sided pre-cast segmental rectangular arch to replace a deteriorated 15’ x 7’ concrete culvert carrying Slater creek on a skewed alignment under Dewey Avenue - consisting of four traffi c...read more |
| Town of Perinton Erosion AbatementMRB Group, working with the Town of Perinton, successfully completed the stabilization of a 75 foot high embankment, which was at a 1:1 slope. The erosion associated with the slope was not only degrading the water...read more |
| Seneca Falls Comprehensive Drainage StudyIn 1999, MRB Group was hired to complete a comprehensive drainage study of the entire Village of Seneca Falls. The study included existing drainage conditions and infrastructure, existing and potential problem areas,...read more |
| Baird Road Culvert Replacement The Town of Penfield wanted to replace an obsolete stone box culvert carrying Baird Road over Hipp Brook. They wanted the new culvert to: • Maintain the same waterway opening as the original structure •...read more |
| Larking Creek Channel MRB Group was hired by the Town of Greece to develop plans and specifications for channel improvements at three locations along Round Pond Creek and Larkin Creek. The project was financed through...read more |
| Mill Creek Erosion Control - Pittsford The Town of Pittsford contracted MRB Group to work on an erosion/bank stabilization project to mitigate erosion impacts on the embankments of Mill Creek near LePere Drive in the Town. MRB Group...read more |
| Sand Hill Road Bridge MRB Group was hired by the Town of Farmington to develop a road and bridge design to replace an existing bridge that was in poor condition, and to provide grading and stabilization of the banks along...read more |
| St John Fisher CollegeMRB Group was contracted by St. John Fisher College to analyze the existing drainage collection system and drainage patterns for 23 acres around the campus athletic facility. The College is an independent, liberal...read more |
| Red Creek Regional Wastewater Treatment FacilityMRB Group designed and bid this new regional Wastewater Treatment Facility in 2005 after preparing the Engineering Report and Facility Plan, which formed the basis of design and brought closure to years of planning...read more |
| Penfield Sewer Operations BuildingMRB Group developed plans and specifications for a new metal building for the Town of Penfield’s sewer department at its highway garage campus on Jackson Road. We worked closely with the Town to prepare the construction...read more |
| Avon Wastewater Treatment FacilityMRB Group has designed improvements and administered construction for many projects at the Village sewage treatment plant over the past several years, including improvements to various components of the facility. Here...read more |
| Farmington Wastewater Treatment FacilityThe Farmington wastewater treatment facility, located on McMahon Rd., services the Towns of Farmington and Victor, including Eastview Mall. MRB Group has worked with the Town of Farmington since we designed its initial...read more |
| Geneseo Wastewater Treatment FacilityMRB Group was hired to complete the contract documents for a wastewater treatment plant for the Village of Geneseo. As part of the Village of Geneseo’s wastewater treatment plant project, we worked on...read more |
| Lyon's Wastewater Treatment FacilityIn 1994, MRB Group was hired by the Village of Lyons to: • Conduct a Facility Plan to evaluate the Village’s wastewater treatment plant condition • Review alternatives to improve the performance...read more |
| Ontario Wastewater Treatment FacilityThe Town of Ontario contracted MRB Group to provide services from our many disciplines on this project to replace and rehabilitate the Town’s original Wastewater Treatment Facility Plant components: •...read more |
| Seneca Falls Wastewater Treatment FacilityMRB Group was hired to be the design engineers and construction managers for a Wastewater Treatment Plant Improvement Project for the Village of Seneca Falls. The project scope involved six disciplines: • Civil •...read more |
| Wayland Wastewater Treatment FacilityMRB Group was contracted to prepare a Facility Plan to determine a cost-effective method for repairing, rehabilitating, and replacing the Village of Wayland’s existing waste water treatment plant facilities....read more |
| Waterloo Wastewater Treatment FacilityMRB Group was hired as the design engineers and construction managers for the Village of Waterloo wastewater treatment plant improvement project. As part of our project scope, we had to ensure the construction...read more |
| Mt Morris Compositing FacilityMRB Group was hired by the Village of Mt. Morris to help construct a sewage sludge composting facility. The end result is a facility where sewage sludge composting takes place under an enclosed pole barn structure...read more |
| Ontario Compositing FacilityMRB Group was hired to design and construct of a 240’ x 60’ composting facility for the Town of Ontario. The design objective of the new compositing facility was to provide an economical means...read more |
| Bristol Water/Wastewater Treatment Plant Bristol Mountain Ski Resort contracted MRB Group to work on a wastewater project consisting of a package plant to replace the existing RBC plant. The objective was for the new facility equipment to utilize...read more |
| Macedon Wastewater Treatment FacilityThis project involved the upgrading of the Town/Village of Macedon’s Wastewater Treatment Facility using two synthetic media bio-towers. Each tower is 18’0" high and 40’-0" in diameter....read more |
| Mt Morris Compositing Facility UpgradeThis project involved the construction of a 50’ x 80’ addition to the existing pole barn structure, as well as the purchase of a new screening machine. MRB Group worked with the Village on this project...read more |
| Village of Arkport Water System ImprovementsMRB Group provided design and construction management services for this multi-phased water system improvement project in the Village of Arkport, which consisted of the following elements: Phase I included a new...read more |
| Reservoir Road Watermain ImprovementsMRB Group designed and installed 23,000 LF of 8” and 12” watermain and appurtenances for the Town of Geneseo. In addition, a 200,000 gallon elevated, welded steel water storage tank was installed. This project...read more |
| Village of Avon New Water Filtration PlantAs engineering consultant for the Village of Avon, MRB Group was authorized to evaluate, design, inspect, and be construction managers of a new 1.0 MGD water fi ltration plant project. The project consisted of installing...read more |
| Canandaigua Water Booster Pump StationThe Town of Canandaigua contracted MRB Group to design a water booster pumping station on West Street in the Town. The booster pumps convey treated water from the City of Canandaigua to the Town of Canandaigua water...read more |
| Dansville Water Treatment PlantMRB Group completed construction on this new water treatment facility for the Village of Dansville. The facility contains three US Filter stainless steel structures each capable of filtering 1.0 million gallons of...read more |
| Hume Water System ImprovementsMRB Group provided design services to the Town of Hume for its Water System Improvements project. The two-phase project included replacing several old, outdated watermains, improving fire flows to the existing district,...read more |
| Ontario Raw Water Intake Treatment PlantMRB Group was hired by the Town of Ontario to provide the following services for a new raw water intake system and pump station for the Town of Ontario’s 3.5 MG Water Treatment Plant: • Study •...read more |
| Seneca Falls Low Lift Pump StationMRB Group was hired to design a replacement low lift pump station for the Village of Seneca Falls and to upgrade its existing water treatment plant. We designed numerous upgrades for the water treatment plant...read more |
| Village of VanEtten Water SystemMRB Group was hired to provide design and construction administration/ observation services for a new municipal water system that now serves the Village of VanEtten’s approximately 200 residential and commercial...read more |
| Avon Water Treatment PlantMRB Group is an Engineering Consultant for the Village of Avon. In this role, we evaluated, designed, inspected, and construction managed a new 1.0 MGD water filtration plant project for the Village of Avon. The...read more |
| Kodak Polychrome GraphicsMRB Group worked closely with Nortel Networks and IBM to design Kodak Polychrome to meet its Owner’s stringent requirements. The Kodak Polychrome design-build project included designing and constructing a new call...read more |
| Rochester Yacht Club RenovationMRB Group worked with an interior design firm to expand the club by 42,000 square feet, which totally renovated and beautified this notable structure. Originally built in 1922, the Rochester Yacht Club now boasts an...read more |
| Richardson Grating LaboratoryRichardson Grating, a sophisticated optics manufacturing operation in the City of Rochester, needed to expand its facilities. The company manufactures lenses for telescopes and satellites for clients including NASA,...read more |
| Auction Direct USA in Raleigh, NCMRB Group provides a full range of professional design and construction management services to Auction Direct USA, a national used car superstore chain. Our skilled team of design, management, and construction professionals...read more |
| Automotive Corporation, Inc.In the Fall of 2002, MRB Group worked closely with Automotive Corporation, Inc. on construction of 160,000 square feet of new manufacturing space at the Batavia Gateway Corporate Park. This was one of the largest projects...read more |
| AppleTree Acres Corporate ParkWe designed the sanitary sewer and water utility extensions and pump stations for this 180 acre corporate park. Planning included: Lot layout Subdivision Drainage studies Road design, Contract administration...read more |
| Lac de VilleMRB Group was a key player in the development of Lac de Ville, a 107 acre, planned unit development in the Town of Brighton. We began working on the infrastructure for this project in 1966 and completed the final parcel...read more |
| Ulster County Office Complex...read more |
| Calkins Road Professional Business ParkTo date, the infrastructure (utilities and roadways) and approximately 350,000 square feet of office space for the first 65 acres of the parcel have been completed with assistance from MRB Group. The project team continues...read more |
| Automotive Corporation, Inc.Automotive Corporation, Inc. constructed 160,000 square feet of new manufacturing space at the Batavia Gateway Corporate Park in Fall 2002. This is one of the largest projects of its kind for Genesee County. MRB Group...read more |
| Farmington Industrial ParkThis 60 acre industrial park was constructed and anchored by Videk, a division of Kodak. The overall industrial park design also included the site-specific design for Videk. MRB Group performed the following services...read more |
| Centerpointe ParkThis 425-acre planned unit development is comprised of the following components: - Upgrade to a pre-existing 174-acre golf course - 60 acres of wetland - 38 commercial acres and 100 industrial acres - 20 acres...read more |
| East Bloomfield Industrial ParkThis 90 acre industrial park was constructed and anchored by Rhone-Polane, a French company that produces plastic film. The overall industrial park design also included the site-specific design for Rhone-Polane. MRB...read more |
| Brighton-Henrietta Townline Industrial ParkThis ten acre industrial park was subdivided and developed as fi ve separate, site-specifi c industrial parcels. MRB Group performed the following services for this project: - Site survey and subdivision - Environmental...read more |
| Geneseo Gateway Industrial Park and State Route 20A ImprovementsMRB Group designed and managed bidding and construction administration/observation for Geneseo Gateway, an approximately 200-acre mixed-use (commercial, light industrial, office, and residential) development park. The...read more |
| Yates County Industrial Development AgencyMRB Group completed a report evaluating the feasibility of developing an industrial park in the Town of Milo for the Pulver Property Proposed Industrial Park. Our report included: A description of the existing...read more |
| American Rock Salt Mine FacilityMRB Group developed site design components and provided construction administration for surface facilities at the new salt mine facility. Our design work included: ± 6,000 LF of 8” and 12” watermain ± 5,100...read more |
| Bristol Water Treatment PlantBristol Mountain Ski Resort contracted MRB Group to design a new water treatment plant. With a summit elevation of 2200’, a base elevation of 1000’, and a vertical of 1200’, Bristol reign as the highest...read more |
| Cahoon FarmsMRB Group managed the design and construction of this privately-funded project, which included a new filtration building, a water supply booster station, and new watermain for Cahoon Farms. We developed the...read more |
| Riverton DevelopmentMRB Group has been involved with the Riverton Development project for years. We began infrastructure and housing in April 2001 and completed them in April 2003. Now Section V and VI, on Sparrow Drive and Hummingbird...read more |
| Canopy Trail Residential SubdivisionMRB Group designed this residential cluster development on Phillips Road in the Town of Webster. The design included all aspects of traditional site development including: Survey Road/infrastructure design...read more |
| American Rock Salt Offsite WaterMRB Group worked with the Livingston County Water & Sewer Authority, the Town of Groveland, and the Village/Town of Mt. Morris on this project to support a new salt mine facility at Hampton Corners. Our...read more |
| Wastewater Treatment Plant - Village of Lima...read more |
| Creek Street Sanitary Sewer - Town of PenfieldMRB Group was hired to design a project on the heart of the Town of Penfield’s Extension 16 Sanitary Sewer Project. This project provided sanitary sewer service to more than 300 homes and businesses in the Creek...read more |
| Wastewater Treatment Facility - Town of FarmingtonThe Farmington wastewater treatment facility, located on McMahon Rd., services the Towns of Farmington and Victor, including Eastview Mall. MRB Group has worked with the Town of Farmington since we designed its initial...read more |
| Wastewater Treatment Plant - Village of WaterlooMRB Group was hired as the design engineers and construction managers for the Village of Waterloo wastewater treatment plant improvement project. As part of our project scope, we had to ensure the construction sequence...read more |
| Wastewater Treatment Plant - Village of GeneseoMRB Group was hired to complete the contract documents for a wastewater treatment plant for the Village of Geneseo. As part of the Village of Geneseo’s wastewater treatment plant project, we worked on the following...read more |
| Ambulance Facility - Village of LimaMRB Group designed and managed construction bidding of a new ambulance facility for the Village of Lima. This 5,700 square foot ambulance facility includes concrete plank walls with siding, a brick ledge along the lower...read more |
| Red Creek Area Regional Wastewater Treatment FacilityFacility in 2005 for the Wayne County Water and Sewer Authority in the Village of Red Creek. Prior to beginning the project, we prepared the Engineering Report and Facility Plan, which formed the basis of design and...read more |
| Fire Hall - Part Town of Avon Fire DistrictMRB Group designed plans for The Town of Avon’s new fire hall in 2003. We then provided construction observation services while it was being built in 2003 and 2004. The new structure is a 15,000 square foot...read more |
| Water System Improvements - Village of ArkportMRB Group provided design and construction management services for this multi-phased water system improvement project in the Village of Arkport. The project consisted of five phases: • Phase I...read more |
| New Water Filtration Plant - Village of DansvilleMRB Group completed construction on this new water treatment facility for the Village of Dansville. The facility contains three US Filter stainless steel structures each capable of filtering 1.0 million gallons of water...read more |
| Wastewater Treatment Plant - Village of AvonMRB Group has designed improvements and administered construction for many projects at the Village sewage treatment plant over the past several years, including improvements to various components of the facility. Here...read more |
| Weager Springs Water Filtration SystemMRB Group was hired by the Village of Wolcott to work on a new filtration building adjacent to an existing 300,000 gallon underground reservoir in this Wayne County village. The objective of the project was to treat...read more |
| Scottsville Fire HallThis new Fire Hall was designed by MRB Group to fulfill the Village’s mission to have a state-of-the-art facility for emergency services. For this project MRB Group attended public meetings and assisted with...read more |
| New Water Filtration Plant - Village of AvonMRB Group is an Engineering Consultant for the Village of Avon. In this role, we evaluated, designed, inspected, and construction managed a new 1.0 MGD water filtration plant project for the Village of Avon. The project...read more |
| Spencerport ForcemainThe Village of Spencerport hired MRB Group to work on its forcemain project, which is part of a large capital project to construct a pump station and forcemain to convey Spencerport’s sewage to a Monroe County...read more |
| Spencerport PumpstationThe Village of Spencerport hired MRB Group to help evaluate several options to upgrade and expand its existing waste water treatment facility. Based on the evaluations, the Village Board chose to construct a pump station...read more |
| Auction DirectMRB Group provides a full range of professional design and construction management services to Auction Direct USA, a national used car superstore chain. Our skilled team of design, management, and construction professionals...read more |
| Browncroft Community Church ExpansionMRB Group provided the following site development services for the Browncroft Community Church office, classroom, and 2,500 seat sanctuary addition: Addressed Phase II drainage issues regarding...read more |
| Pittsford Community ChurchMRB Group provided architectural design services as part of a Design-Build construction approach to this project. In conjunction with various team members, construction of the 15,000 SF Family Life Center and classroom...read more |
| SUNY Brockport• Survey layout for the reconstruction of campus improvements between Hartwell Hall, Morgan Hall and Neff Hall. • Holley Street parking lot lighting and electrical ...read more |
| Cornell UniversityThis project consisted of reviewing, reporting and implementing MRB Group’s recommendations for the interior and exterior painting of an elevated 150,000 gallon water tank at the Agricultural Experiment Station...read more |
| Finger Lake Community College• Three multi-purpose soccer fields including access roads and irrigation. • Building conditions survey of seven off-site buildings for the proposed use of campus housing. • Main campus...read more |
| Keuka College• Total renovation of Richardson Hall - a 1930’s three-story brick dormitory. • Building conditions survey of Ball Hall for residents, administration and classrooms to establish a budget and facility...read more |
| Monroe Community College...read more |
| Athletic Field - Hannibal Central School DistrictThis project consisted of a soccer/football combination field, a soccer field, and a soccer/baseball combination field. Renovation consisted of regrading to improve playability and drainage. In addition to...read more |
| Track Improvements - Hannibal Central School DistrictThis project consisted of track and field event improvements. The track was changed from a 440-yard track to a standard 400-meter track. The existing surface was milled off and a new rubberized granular track surface...read more |
| Athletic Field - Johnstown School DistrictThis work included the layout, development, and design to construct four new athletic fields at the high school, which were comprised of two (2) soccer fields, one (1) baseball field, and one (1) softball field. ...read more |
| Baseball Field - North Rose, Wolcott Central School District...read more |
| Soccer Field - North Rose, Wolcott Central School District...read more |
| Track Improvements - North Rose, Wolcott Central School DistrictThis project included the layout and design of a new polyurethane track from an existing cinder track. All associated field events including the high jump area, pole vault, long jump (pit and runway), and triple...read more |